Commission and validate your data center's entire power chain — from backup generators to UPS and cooling infrastructure — under full-load conditions, before an outage occurs.
A data center is only as reliable as its power infrastructure. Partial testing leaves critical gaps that can lead to catastrophic failure during an actual outage.
Automatic transfer switches (ATS) and static bypass switches may fail to operate correctly under full-load conditions. Only load testing reveals hidden issues in the transfer sequence.
Full generator load generates significant heat. Without simultaneous cooling load testing, your cooling infrastructure may be undersized, leading to overheating and shutdown.
N+1 or 2N redundancy architectures must be validated under load. A single failure during testing can expose systemic weaknesses in your redundancy design.
Data center commissioning requires documented full-load testing for all power equipment (generators, UPS, switchgear). Without it, you risk project delays and operational sign-off issues.
We provide comprehensive load bank testing to validate your data center's entire power infrastructure — from utility feed and generators through UPS and distribution to IT rack-level PDUs. Our testing simulates a complete grid failure, verifying that every component performs as designed.
What we test and verify:
Our testing process:
Review one-line diagrams, load profiles, and redundancy architecture
Implement lock-out/tag-out, isolate non-test loads, plan for contingencies
Full step-load test (25%→50%→75%→100%) with data logging
Simulate utility loss, verify UPS transfer and battery autonomy
Test full power chain under load — generator to UPS to distribution
Comprehensive documentation with pass/fail analysis and recommendations
Data center testing requires a combination of load banks, UPS testers, and monitoring equipment to validate the entire power chain.
| Equipment | Application | Key Features | Best For |
|---|---|---|---|
| RLC Containerised Load Bank | Generator & UPS full-load testing | Multi-megawatt capacity, resistive+reactive, data logging | Large data centers, hyperscale facilities |
| Resistive Portable Load Bank | Generator maintenance & acceptance | 500kW–2MW, trailer-mounted, rental friendly | Mid-size data centers, colocation |
| DC Battery Tester | UPS battery string validation | Discharge testing, cell-by-cell monitoring | UPS battery replacement, capacity verification |
| Cooling Load Simulator | Thermal infrastructure validation | Simulates heat load, verifies cooling capacity | Data centers with liquid or air cooling |
Our engineering team specializes in data center power commissioning and load testing. We'll work with your team to design and execute a comprehensive test plan.